Archive: 2019-09

Site Upgrade/Pump Install - Woodwards - Port Hope Simpson, NL
Installed two new above ground storage tanks and plumbed them in. Installed one new pump along with re-installation of the existing site pump onto a new concrete island. [...]

Site Upgrade - Woodwards - Happy Valley-Goose Bay NL
We removed the old concrete pad to improve water managemant of the tanks sumps and repoured a new pad in its place. [...]